An early start and a very hot motor/sail to Cardiff and back.
![](https://molia.org/wp-content/uploads/2021/07/20210722_095037-576x1024.jpg)
In Cardiff barrage lock by 1000
Will checking the dingy works – with oars.
Skipper’s turn at the oars.
And the ePropulsion electric motor still works this year as well.
Travels and boat care