An early start and a very hot motor/sail to Cardiff and back.
0700 lock out of Portishead and breakfast onboard.
In Cardiff barrage lock by 1000
Will checking the dingy works – with oars.
Skipper’s turn at the oars.
And the ePropulsion electric motor still works this year as well.